Primer for Green Concrete
allows Epoxy Coating in 24 Hours
Time is money. Nobody understands this cliché better than owners who must
replace epoxy-coated concrete floors in their commercial and industrial facilities.
The downtime typically required to wait for the new concrete to cure and dry and to
prepare the surface and applying the coating can cost owners huge sums of money.
The solution,
100% solids epoxy curing compound and primer is
applied to floors less than 24 hours after the concrete is placed. An
epoxy coating can then be applied over the primer the following day or, in
some cases, the same day. No
shot blasting or other mechanical surface preparation is required.
|